Slate Roof Calculator
How many slates your roof takes for the size you want and the headlap your pitch needs, with the eave course, hips and ridges, breakage, nails and weight.
By Marko Visic, BSc Physics · Updated November 25, 2026
Eave: the roof's bottom edges. Cuts: the hips, valleys and other lines where field slates are cut on an angle.
Headlap: at 10:12 the code asks for 3 in, so 18 in slates show (18 − 3) ÷ 2 = 7.5 in.[2][3]
Field slate: 2,000 ÷ 100 = 20 squares of roof.[1] A square takes 192 slates of 18 x 10 in at a 3 in headlap, which is how slate is sold: 20 × 192 = 3,840 slates.[4]
To order: with 5% for breakage, 20 × (100 + 5) ÷ 100 = 21 squares of 18 x 10 in slate; the NSA calls 5% a typical allowance.[1]
Eave course: undereave slates lie lengthwise along the eave, at least 7.5 + 3 = 10.5 in wide, so 18 x 11 in, the next width the table lists.[1][4] The eave takes 80 × 12 ÷ 18 = 53.33 → 54 pieces, or 54 ÷ 175 = 0.31 squares of that size; with 5% for breakage, 54 × (100 + 5) ÷ 100 = 56.7 → 57 pieces.[1][4]
Hips and ridges: 16 in slates lapped by half, the NSA's 50% overlap, show 16 ÷ 2 = 8 in, the same count on each side of the line.[1] The line takes 40 × 12 ÷ 8 = 60 a side, 60 × 2 = 120 pieces, or 120 × (100 + 5) ÷ 100 = 126 with your 5% for breakage.
Nails: 2 for each slate, so (3,840 + 54 + 120) × 2 = 8,028 nails, each 2 × 0.25 + 1 = 1.5 in long, twice the slate's thickness plus 1 in.[2][5]
Weight: the NSA puts 1/4 in slate at about 9.35 psf on a 3 in headlap, so the field slate weighs about 9.35 × 2,000 = 18,700 lb.[6] Where the house never had a slate roof, the NSA says a structural engineer should check the framing first.[6]
How many slates do I need? Divide the roof area by 100 for squares, then multiply by the slates a square takes for your size at the headlap your pitch needs.[1][2] For 2,000 sq ft of 18 x 10 in slate on a 10:12 roof, a 3 in headlap: 2,000 ÷ 100 = 20 squares, and 20 × 192 = 3,840 slates.[1][4]

Drawing: CalculateMyRoof · CC BY 4.0 · How to reuse
How many slates make a square
Slate is sold by the square: enough slate of any size to cover 100 sq ft of roof laid with a 3 in headlap.[1] Headlap is the part of a slate that the butt of the slate two courses above still covers, and North American quarries count the pieces in a square at 3 in.[3] A longer slate shows more of itself, so fewer of them make a square. The National Slate Association's field guide lists the sizes from 10 to 24 in long at three headlaps:[4]
| Slate size | 3 in headlap | 2 in headlap | 4 in headlap[4] |
|---|---|---|---|
| 24 x 14 in | 98 | 94 | 103[4] |
| 24 x 12 in | 115 | 109 | 120[4] |
| 22 x 14 in | 108 | 103 | 114[4] |
| 22 x 12 in | 126 | 120 | 133[4] |
| 22 x 11 in | 137 | 131 | 146[4] |
| 20 x 14 in | 121 | 114 | 129[4] |
| 20 x 12 in | 141 | 133 | 150[4] |
| 20 x 11 in | 154 | 146 | 164[4] |
| 20 x 10 in | 170 | 160 | 180[4] |
| 18 x 14 in | 137 | 129 | 147[4] |
| 18 x 12 in | 160 | 150 | 171[4] |
| 18 x 11 in | 175 | 164 | 187[4] |
| 18 x 10 in | 192 | 180 | 206[4] |
| 18 x 9 in | 213 | 200 | 229[4] |
| 16 x 14 in | 158 | 147 | 171[4] |
| 16 x 12 in | 185 | 171 | 200[4] |
| 16 x 11 in | 201 | 187 | 218[4] |
| 16 x 10 in | 222 | 206 | 240[4] |
| 16 x 9 in | 246 | 229 | 267[4] |
| 16 x 8 in | 277 | 257 | 300[4] |
| 14 x 12 in | 218 | 200 | 240[4] |
| 14 x 11 in | 238 | 218 | 262[4] |
| 14 x 10 in | 262 | 240 | 288[4] |
| 14 x 9 in | 290 | 267 | 320[4] |
| 14 x 8 in | 327 | 300 | 360[4] |
| 14 x 7 in | 374 | 343 | 411[4] |
| 12 x 10 in | 320 | 288 | 360[4] |
| 12 x 9 in | 355 | 320 | 400[4] |
| 12 x 8 in | 400 | 360 | 450[4] |
| 12 x 7 in | 457 | 411 | 514[4] |
| 12 x 6 in | 534 | 480 | 600[4] |
| 10 x 8 in | 516 | 450 | 600[4] |
| 10 x 7 in | 588 | 514 | 686[4] |
| 10 x 6 in | 685 | 600 | 800[4] |
At any other headlap, the field guide turns the count back into squares as sold: the roof's squares times the slates at your headlap, divided by the slates at 3 in.[4] On a 6:12 roof, where the code asks for a 4 in headlap, the same 18 x 10 in slate takes 206 a square instead of 192, so 20 × 206 = 4,120 slates, or 20 × 206 ÷ 192 = 21.46 squares to buy.[2][4]
Headlap by roof pitch
The code sets the headlap by slope: 4 in from 4:12 up to 8:12, 3 in from 8:12 up to 20:12, and 2 in at 20:12 and steeper.[2] Below 4:12 it doesn't allow slate at all.[2]
What shows is the exposure: the slate's length less the headlap, divided by 2.[3] An 18 in slate shows (18 − 4) ÷ 2 = 7 in at 6:12, (18 − 3) ÷ 2 = 7.5 in at 10:12 and (18 − 2) ÷ 2 = 8 in at 20:12.[2][3] The exposure also sets the spacing of the chalk lines for the courses.[3]
Worked example
Take a gable roof of 2,000 sq ft at 10:12, slated in 18 x 10 in slate 1/4 in thick, with 80 ft of eave and a 40 ft ridge. The code asks for a 3 in headlap at that pitch, so each slate shows (18 − 3) ÷ 2 = 7.5 in.[2][4] The field takes 20 × 192 = 3,840 slates, and with 5% for breakage, 20 × (100 + 5) ÷ 100 = 21 squares to order.[1][4]
The eave course needs slates at least 7.5 + 3 = 10.5 in wide, so 18 x 11 in.[1][4] Laid lengthwise, the eave takes 80 × 12 ÷ 18 = 53.33 → 54 pieces, or 54 × (100 + 5) ÷ 100 = 56.7 → 57 with 5% for breakage.[4] The ridge, in 16 in slates showing 16 ÷ 2 = 8 in, takes 40 × 12 ÷ 8 = 60 on each side, 60 × 2 = 120 pieces, and 120 × (100 + 5) ÷ 100 = 126 with the same 5%.[1]
At 2 nails a slate, that is (3,840 + 54 + 120) × 2 = 8,028 nails, each 2 × 0.25 + 1 = 1.5 in long.[5] The NSA's 9.35 psf for 1/4 in slate puts the field slate at 9.35 × 2,000 = 18,700 lb.[6]
Hips, valleys and the eave course
Wherever slates are cut on an angle, at hips and valleys, part of each is thrown away. The NSA's estimating method allows a square of slate for every 100 ft of cut work, though it varies with the slate: 60 ft of hips and valleys adds 60 ÷ 100 = 0.6 square.[1]
The undereave, or starter, course is laid sideways with its long side along the eave. It must be at least 3 in wider than the exposure of the field slates, 4 in on slopes under 8:12 and 2 in at 20:12 or more, the same steps as the headlap.[1] The NSA's own example is the one above: an 18 in slate showing 7.5 in needs at least 10.5 in, so 11 in, the next standard width.[1] Its length can be the field slate's width, twice that, or any length that keeps its joints at least 3 in from those of the first course; the calculator uses the field slate's length.[1]
Pieces of an odd size go back into squares by dividing by that size's count at a 3 in headlap: the NSA turns 610 undereave slates of 18 x 11 in into 610 ÷ 175 = 3.49 squares and orders 3.5.[1] In the worked example that is 54 ÷ 175 = 0.31 squares.[1]
Hip and ridge slates in a saddle pattern lap each other by 50%, with the same count on each side of the line; the NSA treats 16 in hip slates as showing 8 in.[1] They can also be ordered by the piece or the foot, and undereave slates by the foot.[1]
Breakage and spare slate
Some slate breaks on the way from the quarry to the roof. The NSA calls 5% of the field and component squares a typical allowance, and says it can be as little as a few slates, or more where the slate is handled roughly.[1] Best practice, and often the contract, also leaves extra slate on site as the owner's stock for repairs with matching slate.[1] A graduated roof, in slate of several sizes, is figured band by band from eave to ridge, allowing an extra 1 in of headlap wherever the slate length changes.[1] The calculator handles one size at a time.
Nails
The code calls for 2 fasteners per slate.[2] The NSA adds that slates 3/4 in thick or more and 20 in long or more take 4, the extra pair 2 in above the regular holes.[5] A nail is twice the slate's thickness plus 1 in long.[5] Most are 11-gauge smooth-shank copper; larger slates, hardwood decks and the longer nails at hips take 10-gauge, and gypsum or concrete decks take smooth shank rather than ring shank.[5] Each nail is set in the countersink of the slate's hole, neither overdriven nor left proud: the slate hangs on its nails.[5] No nail goes through flashing.[5]
How much a slate roof weighs
The NSA puts 1/4 in slate at about 935 lb per square, or 9.35 psf, laid at a 3 in headlap, and 1/2 in slate at about 18.70 psf.[6] The two figures scale with thickness, 9.35 × 0.5 ÷ 0.25 = 18.7 psf, so the calculator scales the 1/4 in figure to your thickness, and to your headlap by the slates per square.[6] Neither figure names a slate size; shorter slates lap more of their length, so a square of them weighs a little more.
At these weights the NSA warns that the load can be too much for ordinary post-war framing.[6] Where a house never had a slate roof, it says:
a licensed structural engineer should evaluate the roof framing
The roof load calculator sets a covering's weight against the loads the code's rafter tables assume.
What the code asks of a slate roof
- A slope of at least 4:12, and the headlaps above.[2]
- A deck of wood structural panels or solid lumber, and slate that meets ASTM C406.[2]
- An ice barrier at the eaves where your jurisdiction records ice forming there.[2]
- A wind class on the packaging from testing to ASTM D3161: class A, D or F up to an ultimate design wind speed of 129 mph, class F above it.[2]
- 2 fasteners per slate.[2]
- Sheet-metal flashing, with valley flashing at least 15 in wide and at least 0.0179 in thick, zinc-coated G90.[2]
Replacing a slate roof
HUD's planning table gives slate an estimated useful life of 75 years, the longest of any covering it lists.[7] When it does need replacing, the code doesn't allow a new covering over slate, so the old slate comes off first.[2] The roof lifespan page compares the other coverings.
Slate prices
This page prints no slate prices: quarries, suppliers and roofers quote them, and no public source tracks them. Enter the price per square from a quote, and the calculator multiplies it by the squares to order.
Slate roof formulas
- Squares of roof = roof area ÷ 100.[1]
- Slates = squares × the table's slates per square at your headlap.[4]
- Squares to buy = squares × slates at your headlap ÷ slates at 3 in.[4]
- Exposure (in) = (slate length − headlap) ÷ 2.[3]
- Cut work (squares) = feet of hips and valleys ÷ 100.[1]
- Undereave width (in) = exposure + headlap, up to the next standard width.[1]
- Hip and ridge pieces = feet × 12 ÷ (slate length ÷ 2), on each side.[1]
- Nail length (in) = 2 × thickness + 1.[5]
Common questions
How do you calculate how many slates you need?
Divide the roof area by 100 for squares and multiply by the slates per square for your size and headlap.[1][4] In the worked example above, 20 × 192 = 3,840 slates.[4]
How many slates are in a square?
At a 3 in headlap, from 98 for 24 x 14 in slates to 685 for 10 x 6 in.[4] The table above lists every size in lengths of 24, 22, 20, 18, 16, 14, 12, and 10 in.[4]
How much does a slate roof weigh per square foot?
About 9.35 psf for 1/4 in slate and 18.70 psf for 1/2 in, by the NSA's figures.[6]
What headlap does a slate roof need?
4 in from 4:12 to 8:12, 3 in up to 20:12, and 2 in above.[2]
How long should slate nails be?
Twice the slate's thickness plus 1 in, so 2 × 0.25 + 1 = 1.5 in for slate 0.25 in thick.[5]
Can you put a new roof over slate?
No. The code doesn't allow a new covering over an existing slate roof; the slate is removed first.[2]
How much is a slate roof per square foot?
There is no public price source to quote, so this page prints none. Enter a quote's price per square in the calculator and it gives the cost of the slate to order.
Methodology & sources
The slates per square, the conversion between headlaps, the exposure and the nail rules come from the National Slate Association's Mobile Field Guide; the cut work, eave course, hip and ridge and breakage rules from its estimating guidance; the weights from its technical bulletin on slate roofing myths; the headlaps by slope and the other code rules from the 2024 International Residential Code, all read in November 2026.[4][6] Squares, slates, nails and weights are calculated on the page with the formulas above, and the engine is tested on every build. The NSA's table rounds a few sizes a slate or two away from the exposure arithmetic; the calculator uses the table as printed, since slate is sold by it.
Sources
- [1] National Slate Association. Estimating Slate Quantities for Roof Areas. Retrieved Nov 19, 2026. slateassociation.org
- [2] International Code Council. 2024 International Residential Code, Chapter 9: Roof Assemblies (Oct 2026 version). Sections R905.1.2, R905.6.1, R905.6.2, R905.6.4, R905.6.5, R905.6.6, R905.6.7, R908.4. Retrieved Nov 19, 2026. codes.iccsafe.org
- [3] National Slate Association. NSA Mobile Field Guide: Headlap, Exposure, and Offset. Retrieved Nov 19, 2026. mobile.slateassociation.org
- [4] National Slate Association. NSA Mobile Field Guide: Slates per 100 Square Feet. Retrieved Nov 19, 2026. mobile.slateassociation.org
- [5] National Slate Association. NSA Mobile Field Guide: Nails and Nailing. Retrieved Nov 19, 2026. mobile.slateassociation.org
- [6] National Slate Association. Technical Bulletin No. 9: Common Myths About Slate Roofing. Myth No. 7. Retrieved Nov 19, 2026. slateassociation.org
- [7] U.S. Department of Housing and Urban Development. CNA e-Tool Estimated Useful Life Table. 3.3.4. Retrieved Oct 9, 2026. hud.gov
Change log: first published November 25, 2026.