Roof Pitch Chart
Every pitch from 1:12 to 24:12, with the angle, grade, and multipliers a roof job needs, plus the pitch at every 5° up to 60°.
By Marko Visic, BSc Physics · Updated November 25, 2026

Drawing: CalculateMyRoof · CC BY 4.0 · How to reuse
Download the chart as a PNG (2400 px wide).
A roof pitch chart turns a pitch into its angle, percent grade, and the multipliers you need for area and rafters. This chart lists every pitch from 1:12 to 24:12, the pitch at every 5° up to 60°, and which coverings the IRC allows as the slope climbs. Pitch is the rise per 12 in of run.[1]
Pitch to degrees, grade, and multipliers
Read across for any pitch: the angle in degrees, the percent grade, the pitch multiplier (footprint to sloped area, and to the rafter run), and the hip/valley factor. Every figure is calculated with the formulas below. For a value between these rows, use the calculator.
| Pitch | Angle = atan(rise ÷ 12) | Grade % = rise ÷ 12 × 100 | Multiplier = √(rise² + 12²) ÷ 12 | Hip/valley = √(rise² + 2 × 12²) ÷ 12 |
|---|---|---|---|---|
| 1:12 | 4.76° | 8.3% | 1.0035 | 1.4167 |
| 2:12 | 9.46° | 16.7% | 1.0138 | 1.4240 |
| 3:12 | 14.04° | 25.0% | 1.0308 | 1.4361 |
| 4:12 | 18.43° | 33.3% | 1.0541 | 1.4530 |
| 5:12 | 22.62° | 41.7% | 1.0833 | 1.4743 |
| 6:12 | 26.57° | 50.0% | 1.1180 | 1.5000 |
| 7:12 | 30.26° | 58.3% | 1.1577 | 1.5298 |
| 8:12 | 33.69° | 66.7% | 1.2019 | 1.5635 |
| 9:12 | 36.87° | 75.0% | 1.2500 | 1.6008 |
| 10:12 | 39.81° | 83.3% | 1.3017 | 1.6415 |
| 11:12 | 42.51° | 91.7% | 1.3566 | 1.6853 |
| 12:12 | 45.00° | 100.0% | 1.4142 | 1.7321 |
| 13:12 | 47.29° | 108.3% | 1.4743 | 1.7815 |
| 14:12 | 49.40° | 116.7% | 1.5366 | 1.8333 |
| 15:12 | 51.34° | 125.0% | 1.6008 | 1.8875 |
| 16:12 | 53.13° | 133.3% | 1.6667 | 1.9437 |
| 17:12 | 54.78° | 141.7% | 1.7341 | 2.0017 |
| 18:12 | 56.31° | 150.0% | 1.8028 | 2.0616 |
| 19:12 | 57.72° | 158.3% | 1.8727 | 2.1230 |
| 20:12 | 59.04° | 166.7% | 1.9437 | 2.1858 |
| 21:12 | 60.26° | 175.0% | 2.0156 | 2.2500 |
| 22:12 | 61.39° | 183.3% | 2.0883 | 2.3154 |
| 23:12 | 62.45° | 191.7% | 2.1619 | 2.3819 |
| 24:12 | 63.43° | 200.0% | 2.2361 | 2.4495 |
Degrees to pitch
For an “x degree roof”, read the pitch and the nearest eighth the tool would round to. The table runs from 5° to 60° in 5° steps, plus 22.5°.
| Angle | Pitch = tan(angle) × 12 | Nearest 1/8 |
|---|---|---|
| 5° | 1.05:12 | 1 |
| 10° | 2.12:12 | 2 1/8 |
| 15° | 3.22:12 | 3 1/4 |
| 20° | 4.37:12 | 4 3/8 |
| 22.5° | 4.97:12 | 5 |
| 25° | 5.60:12 | 5 5/8 |
| 30° | 6.93:12 | 6 7/8 |
| 35° | 8.40:12 | 8 3/8 |
| 40° | 10.07:12 | 10 1/8 |
| 45° | 12.00:12 | 12 |
| 50° | 14.30:12 | 14 1/4 |
| 55° | 17.14:12 | 17 1/8 |
| 60° | 20.78:12 | 20 3/4 |
What the IRC allows as the slope climbs
Minimum slopes group into a few bands. At or above each slope below, the 2024 IRC adds the coverings listed; the figures are the code minimums, cited to their sections. For the full per-covering table and a “can I use it?” checker, see minimum roof pitch.
| At this slope or steeper | Coverings the IRC adds [2] | Sections |
|---|---|---|
| 1/8:12 | Built-up, coal-tar | 2024 IRC R905.9.1 |
| 1/4:12 | Built-up, Standing-seam metal, Modified bitumen, Single-ply (EPDM, TPO), Spray polyurethane foam, Liquid-applied | 2024 IRC R905.9.1, 2024 IRC R905.10.2, 2024 IRC R905.11.1, 2024 IRC R905.12.1, 2024 IRC R905.13.1, 2024 IRC R905.14.1 |
| 1/2:12 | Metal panels, lap sealant | 2024 IRC R905.10.2 |
| 1:12 | Mineral-surfaced roll roofing | 2024 IRC R905.5.2 |
| 2:12 | Asphalt shingles | 2024 IRC R905.2.2 |
| 2 1/2:12 | Clay & concrete tile | 2024 IRC R905.3.2 |
| 3:12 | Metal roof shingles, Wood shingles, Wood shakes, Metal panels, lapped (no sealant) | 2024 IRC R905.4.2, 2024 IRC R905.7.2, 2024 IRC R905.8.2, 2024 IRC R905.10.2 |
| 4:12 | Slate | 2024 IRC R905.6.2 |
Two coverings get a double-underlayment band below 4:12: asphalt shingles from 2:12 to 4:12 and clay and concrete tile from 2 1/2:12 to 4:12.[2]
Low-slope or steep (OSHA)
For its construction fall-protection rules, OSHA draws one line. A low-slope roof is 4 in 12 or less and a steep roof is more than 4 in 12.[3] These classes decide which fall protection workers need on a construction site; they are not rules for homeowners.
Common questions
What is a 6/12 roof pitch in degrees?
A 6:12 roof: angle atan(6 ÷ 12) = 26.57°, grade 6 ÷ 12 × 100 = 50.0%, multiplier √(12² + 6²) ÷ 12 = 1.1180. Jump to its row in the table above.
Does any source name one roof pitch to use?
No public dataset counts US roofs by pitch, so this chart names none. Use the row that matches your measured rise and run.
What pitch is a 30 degree roof?
A 30 degree roof is about 6.93:12 (nearest eighth 6 7/8), from tan(30°) × 12 = 6.93. Read the full list in the degrees-to-pitch table.
Methodology & sources
Every figure in the tables is calculated from the pitch with these formulas:
- angle = arctan(rise ÷ run)
- grade % = rise ÷ run × 100
- multiplier = √(1 + (rise ÷ run)²)
- hip/valley = √(2 + (rise ÷ run)²)
The run is 12 in.[1] The code minimums are facts from the 2024 IRC, each cited to its section, and verified against the code text in October 2026; every build checks each page against those verified facts. The same engine powers the roof pitch calculator, so the chart cannot drift from it.
Sources
- [1] U.S. Navy, Naval Education and Training Professional Development and Technology Center. Builder Basic, NAVEDTRA 14043A (October 2010), Chapter 10: Rough Carpentry. p. 10-51. Retrieved Nov 20, 2026. media.defense.gov
- [2] International Code Council. 2024 International Residential Code, Chapter 9: Roof Assemblies (Oct 2026 version). Sections R905.1.1, R905.2.2, R905.3.2, R905.4.2, R905.5.2, R905.6.2, R905.7.2, R905.8.2, R905.9.1, R905.10.2, R905.11.1, R905.12.1, R905.13.1, R905.14.1. Retrieved Oct 28, 2026. codes.iccsafe.org
- [3] U.S. Occupational Safety and Health Administration (eCFR). 29 CFR 1926.500, Scope, application, and definitions. 1926.500(b). Retrieved Oct 28, 2026. ecfr.gov
Change log: first published November 25, 2026.
Related
By Marko Visic, BSc Physics. Updated November 25, 2026.